Projects · B54 Simblist Rd, Port Botany, NSW

NSW Ports Asphalt Patching

Deep asphalt patching inside a working container terminal, rebuilt in four stepped layers to 220 mm and sealed at every perimeter.

Client
NSW Ports
Location
B54 Simblist Rd, Port Botany, NSW
Project size
65 m²
Discipline
Asphalt

Scope of works

This project involved deep asphalt patching at NSW Ports, including multi-layer pavement reconstruction to restore strength and durability in high-stress areas. Works were executed to strict specifications to ensure long-term performance under heavy port traffic conditions.

Works performed

Pavement removal and profiling

  • Milled and profiled the outlined pavement areas to a total depth of 220 mm, with four stepped layers, as specified.
  • Total removal area measured 65 m², with up to 36.5 t of asphalt and road base waste disposed of in compliance with environmental requirements.

Base preparation

  • Exposed subbase material proof rolled to confirm compaction and load-bearing capacity prior to asphalt placement.
  • Applied bitumen emulsion tack coat to each step and vertical edge.

Asphalt installation

  • Supplied, laid and compacted AC14 A35P asphalt in four layers: layers 1 and 2 at 60 mm each, layers 3 and 4 at 50 mm each.
  • Total asphalt placement up to 36.5 t.

Finishing works

  • Applied hot rubberised bitumen seal to the perimeter of all patches upon completion.
  • Works included all necessary equipment, labour and waste disposal.

Outcome

The repaired pavement sections now provide enhanced structural integrity, a smooth surface finish, and improved resilience to heavy-duty port operations. All works were delivered to specification, within schedule, and in compliance with NSW Ports operational requirements.

On site

Photography from the job

NSW Ports Asphalt Patching - work in progress
NSW Ports Asphalt Patching - work in progress
NSW Ports Asphalt Patching - work in progress
NSW Ports Asphalt Patching - work in progress