Road Surgeons - The road solutions specialists02 8065 8011Request a repair

Projects · M2 Motorway

M2 Crack and Joint Sealing

Ongoing joint and crack sealing across M2 motorway pavement, run at night under traffic control and lighting towers.

Client
Downer
Location
M2 Motorway
Discipline
Crack sealing

Scope of works

Our joint and crack sealing process begins with thoroughly blowing out the joints and cracks to remove dirt, dust, loose debris and other contaminants. Proper preparation ensures the sealant can effectively bond to the pavement surface.

Works performed

  • Joints and cracks blown out to remove dirt, dust, loose debris and other contaminants, so the sealant can bond properly to the pavement surface.
  • A high-quality bitumen crack seal applied to fill and seal the joints and cracks.
  • The seal creates a protective barrier that helps prevent water and debris penetrating the pavement, reducing further deterioration and extending the life of the asphalt or concrete surface.

Outcome

Joint and crack sealing is a cost-effective preventative maintenance solution that helps protect pavement integrity and minimise the need for more extensive repairs in the future.

On site

Photography from the job

M2 Crack and Joint Sealing - work in progress